Light well · San Francisco · no drilling

A shade frame
for the courtyard

A 10-foot freestanding PVC frame sized to your light well, weighted by sand buckets, steadied by guy lines, and wedged against all four walls by eight spring-loaded stubs — a stable ring you can keep building on: shades now, lights or a green wall later. No drilling, comes apart any time.

sized by calculator 10 ft tall · all-PVC 8 spring wall stubs ~2 hrs · 2 people

The frame in 3D

Drag to rotate · pinch to zoom
Plan A: 2 sisters, 2 poles, 2 top bars, 2 grid bars. Strong rails; interior hang points 5–8 lb. · full-screen ↗

Cut calculator

Enter your bucket-to-bucket spacing — every length updates

Enter the distance between bucket centers — the frame top must equal it, since the corners sit on the legs. Cut lengths already subtract ~1″ per fitting. Your rail-to-wall gaps (roughly half a foot, varying by side) are what the stubs span — each one gets measured and cut to fit in step 6.

Spring wall stubs

8 telescoping arms wedge the frame into the well

Each stub is three parts nested like a pen: a 1.25″ sleeve (mounted outward from a tee on the rail or end bar), a compression spring dropped inside, and a 1″ inner slider sealed on both ends — taped-flat mouths, felt pad on the wall face. Sleeve and slider get cut to each spot's measured gap (sleeve = gap − 2″, slider = gap − ½″), so uneven walls don't matter. Gaps under 4″ skip the spring and friction-fit instead. All 8 press outward at once — two per wall, opposing pairs.

WALL ◀━[pad|cap|1″ slider ⟵spring⟵ 1.25″ sleeve]━tee━rail ... rail━tee━[sleeve ⟶spring⟶ slider|cap|pad]━▶ WALL

Why it works in a well: every push has an equal opposing push on the facing wall, like eight tension rods sharing one ring. No drilling, no marks beyond pad contact, and the compliance means seasonal wood/stucco movement or a slightly crooked wall never loosens it. To remove: pull a slider inward against its spring and the whole side releases.

Materials

What's bought — check off as it arrives
0 / 7 collected

Home cut plan

From your 18 × 5 ft halves + 4 × 2 ft — ratchet cutter, ~20 min
PartFromCut toQty

Two numbers only: 12 × 25″ (from 6 halves, two each) and 4 × 51″ (from 4 halves, one each) — joints absorb the fractions. 8 halves stay 5 ft as LEGs. Offcuts: the 25″ cuts leave six ~10″ pieces and the 51″ cuts leave four ~9″ pieces — keep them all; step 6 cuts sleeves from these to each measured gap. Sleeves and sliders get cut per-stub after the frame is up (step 6) — leave the 1″ pipe and offcuts uncut until then. Label as you cut.

Assembly

~2 hours incl. cutting · 2 people · 1 ladder
1

Cut at home, then fill the buckets

  1. Make every cut in the plan above with the ratchet cutter. Write the label on each piece (LEG, SHORT, LONG, SLEEVE, SLIDER).
  2. Make each leg: LEG + coupling + LEG. Push hard and twist a quarter turn as it seats — you want ~1.5″ of pipe inside each side of the coupling.
  3. On the ground, mark the frame rectangle at your bucket spacing (105″ × 105″). A tape measure and chalk or painter's tape is enough.
  4. Set a bucket at each corner mark. Stand one finished leg in the center of each bucket, hold it roughly vertical, and pour sand around it a few inches at a time, tamping with a spare pipe piece as you go. Fill to ~3″ below the rim (~35–40 lb).
  5. Wiggle each leg — it should feel planted, not floppy. Add and tamp more sand if not.
sand sand 4 legs · 4 corners ~35–40 lb each
ZOOM · leg joint push 1.5″ in each side + twist ZOOM · in the bucket sand tamped in layers, 3″ below rim
2

Build the top rectangle on the ground

  1. Make each long rail (×2): SHORT + stub tee + SHORT + center tee + SHORT + stub tee + SHORT. Point the two stub tees' branch openings up for now (they'll face the wall later); the center tee's branch points inward.
  2. Make each end bar (×2): SHORT + stub tee + LONG + stub tee + SHORT. Stub tee branches up for now.
  3. Make the center bar: LONG + coupling + LONG. No tees on this one — it never reaches a wall.
  4. Lay the two rails parallel, the two end bars across their ends, and join the four corners with the 3-way corner elbows: one horizontal hole eats the rail end, the other eats the short-side end, and the third hole points down — that’s the pillar’s seat. You now have a rectangle lying flat with four down-holes at the corners.
  5. Fit the center bar between the two rails' center tees, across the middle of the rectangle.
  6. Press-twist every joint firmly. No glue anywhere.
center bar via 2 tees stub tees
ZOOM · one rail (105″ span) 25″25″25″25″ stub teecenter teestub tee ZOOM · one end bar (105″ span) 25″51″ LONG25″ center bar = 51+51 + coupling
3

Tie the guy lines on the ground

  1. Cut four pieces of paracord, ~14 ft each.
  2. Tie one to each 3-way corner — around its neck where it meets the rail, so the knot can't slide along the pipe. Two half-hitches pulled tight is enough (search "two half hitches" for a 20-second video if knots aren't your thing).
  3. Coil each line loosely and rest it on top of the rectangle so nothing tangles during the lift. That's all this step is: attach now, while the corners are at knee height — the lines get used in step 5.
4 cords, tied flat
ZOOM · the knot spot 2 half-hitches on the corner neck — can't slide along the pipe
4

Lift onto the legs

  1. Two people. Carry the rectangle over the buckets, one person per short end.
  2. Tilt it: seat the two corners on one end onto their leg tops first — the 3-way corner's down-hole slides over the leg. Push-twist each.
  3. One person steadies those; the other climbs the ladder and seats the remaining two corners.
  4. Push down and twist at all four corners so each corner piece grips ~1.5″ of leg. The frame will wobble — that's expected. The guy lines (next step) are what make it rigid, not the joints.
lower onto legs press-fit · no glue
ZOOM · seating a corner 1.5″ overlap 3-way corner's down-hole slides OVER the leg — push + quarter-twist
5

Tension the guy lines

  1. Uncoil the four lines you tied in step 3 so they hang from the corners.
  2. Take the line from corner A and walk it diagonally to the bucket at the other end of the same wall (see diagram — the lines form an X on each long side). Thread it through that bucket's handle.
  3. Pull the line hand-tight and tie it off. Best knot: trucker's hitch (loop mid-line, thread the end through, pull like a pulley — one 30-second video teaches it). If that's too much, three tight half-hitches work; you'll just retie instead of re-tension later.
  4. Repeat for all four corners. Work diagonally opposite pairs so you don't pull the frame crooked.
  5. Test: grab a leg and push. The top should barely move. Saggy line = pull it tighter.
taut · trucker's hitch
ZOOM · at the bucket mid-line loop = pulley: thread end through handle, back up through loop, PULL, pinch + two half-hitches
6

Mount and tune the spring stubs — after the frame is up

  1. Prepare all 8 sliders: seal both ends with duct tape — 3–4 layers stretched flat across the mouth like a drum skin, one wrap around the rim. Fold the felt pad over one end and tape it on — that's the wall face. (The 25mm caps didn't fit; tape does the same job. Swap in 1.315″-OD rubber caps later if you want it prettier.)
  2. Up the ladder at the first stub tee: rotate its branch to point at the wall, then measure that spot's gap, tee to wall. Every stub gets its own numbers.
  3. Cut that stub's SLEEVE to gap minus 2″ and its SLIDER to gap minus ½″. (Example: 5″ gap → 3″ sleeve, 4.5″ slider.) Offcuts cover the sleeves; sliders come off the 1″ pipe.
  4. Gap 4″ or more: sleeve into the tee, spring in — the tee's ~2″ of internal channel plus the sleeve fully swallows the 4″ spring. Then angle the slider's taped end into the sleeve mouth, straighten it, thumb on the pad, push: ~1″ of compression and the pad lands on the stucco. It can't launch — its only free travel is the ½″ to the wall. Gap under 4″: skip the spring; cut the slider for a snug friction fit instead.
  5. Work opposing pairs (both stubs on one wall, then the facing wall, then the two remaining walls) so the frame stays centered instead of walking sideways.
  6. Final test: shove the top ring in each direction. It shouldn't shift. A stub not pressing = pull the slider and stack a second spring behind the first, or recut the slider a touch longer.
2 per wall sleeve→spring→ slider→pad→wall
ZOOM · inside one stub (cutaway) sleeve=gap−2″ · slider=gap−½″ → max travel ½″ railspringinner capgap−½″ sliderpad
7

Drape and clip

  1. From the ladder, throw the tapestry across the top, long (92.5″) side running along the plant wall.
  2. Slide it so it sits over the plant corner, not centered — the open margin goes on the far side.
  3. Clip 6–8 points to the rails and center bar with the tarp clips. Leave a little slack — a drum-tight sheet catches gusts; a loose one spills them.
  4. Step back and check from below: plants shaded, edges open for air. Pull it off (or fold it back) on gray days so the plants keep getting light.
loose clips · open edges
ZOOM · one clip leave a wave of slack — gusts spill instead of pull
8

Hanging bars + rail support poles (upgrade)

  1. Buy: 8 × 10 ft 1.25″ sticks (truck rental keeps them whole), 2 × 1.25″ 4-way tees (side-outlet type — NOT a flat 4-way cross), 2 × 1-5/8″ rubber leg tips, a big pack of 12″ zip ties. Sticks: 2 sisters, 2 poles, 2 top bars, 2 grid bars.
  2. Two top bars: trim two halved sticks to 51″, rejoin each with a coupling → ~103″, matching the center bar. Lay each on top of the rails at the 1/4 and 3/4 positions and lock every end with two heavy zip ties in an X.
  3. Swap each rail’s center tee for the 4-way: one person holds the rail both sides of the tee, the other pulls one SHORT out, slides the center bar end out, pushes the 4-way in — side hole toward the center bar, down-hole at the floor — and reinserts both. Once per rail.
  4. Poles: measure floor to the down-socket, add 1.5″, cut. Rubber tip on the bottom, push the top into the socket. Pure compression — the rail now sits on two short spans instead of one long one, and the sag is gone. The poles stand at the wall midpoints, out of the walkway.
  5. No base plate needed: the top socket stops tipping, and the rubber tip on turf stops sliding.
  6. Sister rails: trim a stick to fit between the corners (~100″) and zip-tie it under each rail every 12″. One jointless pipe carrying the load past the rail’s three press-fit tees. Also your cleanest hanging line.
  7. Grid bars: two more ~103″ pipes running the other way, laid across the two top bars and the center bar. Zip-tie every crossing (6 crossings). Now no bar spans more than ~26″ without support — the top becomes one stiff deck with hanging points everywhere.
  8. Load rules: heavy pots go on the rails right beside the poles. Light pots on the two top bars, hung near the rails not mid-span. PVC creeps — a bar that sags today stays sagged.
top bartop bar rail support pole into the 4-way tee’s down-hole rubber tip at floor side view of one rail · pole at the center tee

Field notes

Read once, thank yourself later
Don't cap the well. Leave open gaps around the tapestry's edges — a sealed opening traps humidity against the windows and starves plants of airflow and ambient light.
Fog weight. A damp tapestry gets heavy. The 1.25″ rails + center bar handle it, but shake water off after wet mornings.
Don't leave it on 24/7. The tapestry is near-opaque. Cover during harsh midday sun, then pull it back so the plants still get the well's limited light.
PVC lean. Tall PVC slowly bows if guy lines slacken. Check tension monthly — a 10-second re-pull on each hitch fixes it.
Storms. If serious weather comes down the well, unclip the tapestry. Frame stays; the sail comes down in 30 seconds.