A 10-foot freestanding PVC frame sized to your light well, weighted by sand buckets, steadied by guy lines, and wedged against all four walls by eight spring-loaded stubs — a stable ring you can keep building on: shades now, lights or a green wall later. No drilling, comes apart any time.
Enter the distance between bucket centers — the frame top must equal it, since the corners sit on the legs. Cut lengths already subtract ~1″ per fitting. Your rail-to-wall gaps (roughly half a foot, varying by side) are what the stubs span — each one gets measured and cut to fit in step 6.
Each stub is three parts nested like a pen: a 1.25″ sleeve (mounted outward from a tee on the rail or end bar), a compression spring dropped inside, and a 1″ inner slider sealed on both ends — taped-flat mouths, felt pad on the wall face. Sleeve and slider get cut to each spot's measured gap (sleeve = gap − 2″, slider = gap − ½″), so uneven walls don't matter. Gaps under 4″ skip the spring and friction-fit instead. All 8 press outward at once — two per wall, opposing pairs.
WALL ◀━[pad|cap|1″ slider ⟵spring⟵ 1.25″ sleeve]━tee━rail ... rail━tee━[sleeve ⟶spring⟶ slider|cap|pad]━▶ WALL
Why it works in a well: every push has an equal opposing push on the facing wall, like eight tension rods sharing one ring. No drilling, no marks beyond pad contact, and the compliance means seasonal wood/stucco movement or a slightly crooked wall never loosens it. To remove: pull a slider inward against its spring and the whole side releases.
| Part | From | Cut to | Qty |
|---|
Two numbers only: 12 × 25″ (from 6 halves, two each) and 4 × 51″ (from 4 halves, one each) — joints absorb the fractions. 8 halves stay 5 ft as LEGs. Offcuts: the 25″ cuts leave six ~10″ pieces and the 51″ cuts leave four ~9″ pieces — keep them all; step 6 cuts sleeves from these to each measured gap. Sleeves and sliders get cut per-stub after the frame is up (step 6) — leave the 1″ pipe and offcuts uncut until then. Label as you cut.